• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Archives for geotextile tubes

Cedar Creek OU2A Remedial Action

August 14, 2018 by IAI

The Cedar Creek OU2A environmental dredging project was conducted to clean up PCBs-contaminated marine sediments from Cedar Creek, in Cedarburg, Wisconsin.  IAI was a member of a team of contractors, who were selected to perform this Remedial Action project, after submitting an alternate proposal for high production hydraulic dredging to geotextile … [Read more...]

Portage Canal Segment 1 Dredging

August 3, 2018 by IAI

Tailored Sediment Removal and Treatment Equipment Make a Big Impact on a Small Project “Use the correct tool for the job,” is a common construction safety rule, reminding us that the right equipment, used properly, will produce the safest, most efficient result. Not only is it important to use the right type of equipment, but also the right size. The … [Read more...]

Mill River Remediation

July 3, 2018 by IAI

IAI provided geotextile tube dewatering and water treatment operations services for the Mill River Remediation Project (Fairfield, CT), and was additionally responsible for odor control during dredging operations.  Work was performed over a three year period, from 2014 – 2016, with operations scheduled in dredging windows, to accommodate shellfish … [Read more...]

Onondaga Lake Clean Up

November 1, 2017 by IAI

Onondaga Lake has undergone a massive remediation effort, involving the removal of 2.2 million cubic yards of contaminated sediment.  The contaminated mud was dewatered in geotextile tubes, over a three year period, from 2012 - 2014. IAI was responsible for operations and maintenance management of the sediment dewatering system, including screening, … [Read more...]

IAI Installs Geotextile Tubes to Restore Emergent Marsh Habitat in Florida

June 23, 2017 by IAI

Next week, IAI Project Manager, Kirk Foley, will be presenting a technical paper on IAIs work on the Mile Point Training Wall project, at the WEDA Dredging Summit & Expo '17.  The paper was co-authored by Kirk and IAI Technical Director, Aaron Wright, and describes the challenges of installing a geotextile tube wall in the fast-moving, tidally-influenced … [Read more...]

Presque Isle Power Plant Pond Dredging

September 19, 2016 by IAI

IAI was selected by We Energies to remove and dispose of accumulated sediment and coal combustion residuals (CCR) from a pond at the Presque Isle Power Plant in picturesque Marquette, Michigan. IAI provided general contractor services, and self-performed the geotextile tube dewatering portion of the work.  Approximately 4,000 cubic yards of coal … [Read more...]

  • 1
  • 2
  • 3
  • 4
  • Next Page »

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions