    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Projects / Geotextile Tube Installations / IAI Installs Geotextile Tubes to Restore Emergent Marsh Habitat in Florida

IAI Installs Geotextile Tubes to Restore Emergent Marsh Habitat in Florida

June 23, 2017 by IAI

Next week, IAI Project Manager, Kirk Foley, will be presenting a technical paper on IAIs work on the Mile Point Training Wall project, at the WEDA Dredging Summit & Expo ’17.  The paper was co-authored by Kirk and IAI Technical Director, Aaron Wright, and describes the challenges of installing a geotextile tube wall in the fast-moving, tidally-influenced waters of the Jacksonville Intracoastal Waterway.

IAI completed this unique geotextile tube installation in 2016, as part of a larger USACE project.  The geotextile tube installation, approximately 3,763-feet long, was designed to protect Great Marsh Island from land loss due to tidal erosion.  Emergent wetlands like Great Marsh Island are an important part of Florida’s ecology, providing important habitat for migratory birds and other wildlife.

IAI installed the geotextile tubes near the intersection of the St. Johns River and the Intracoastal Waterway.  This area experiences difficult cross-currents at ebb tide, eroding wetlands and creating challenging conditions for construction efforts.  The wall was installed in partially in the water, and partially on land; later, dredge spoils were pumped behind the geotextile tube wall, restoring wetland and increasing the size of Great Marsh Island to about 52 acres of marsh habitat.

IAI developed a custom geotextile tube layout plan to achieve the required elevations of the wall.  Along the more than 3,000-foot long alignment length, water depths varied significantly.  Geotextile tubes ranging from a 17-foot circumference to 60-foot circumference were deployed in a single layer, while in the deepest section, a three-layer stack of 34-foot circumference geotextile tubes were needed to meet the design elevation.

Customized filling techniques developed by IAI’s crew were utilized to safely and accurately place the scour aprons and geotextile tubes in areas with high velocity currents.  Our personnel recognized that the use of scour aprons in this application was critical, and successfully executed the installation.  The scour aprons protected the sand base that the geotextile tubes were installed on top of, and prevented it from being washed out by the currents.

IAI filled the geotextile tubes with sand to a height of 6-feet MLLW in temporary areas of the alignment.  When dredging behind the wall was complete, the temporary tubes were cut open and levelled to allow water to flow in and out of the marsh land.  The remainder of the geotextile tubes and scour aprons were left in place under the surface of the water, to provide the island with continued erosion protection.

IAI served as a subcontractor to Manson Construction Company on this project.

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions