• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Archives for Remedial Action

Cedar Creek OU2A Remedial Action

August 14, 2018 by IAI

The Cedar Creek OU2A environmental dredging project was conducted to clean up PCBs-contaminated marine sediments from Cedar Creek, in Cedarburg, Wisconsin.  IAI was a member of a team of contractors, who were selected to perform this Remedial Action project, after submitting an alternate proposal for high production hydraulic dredging to geotextile … [Read more...]

Stevens Point MGP Site Remedial Action Construction

January 14, 2018 by IAI

Infrastructure Alternatives, Inc. (IAI) provided dredging water treatment services for this former manufactured gas plant (MGP) sediment cleanup project in Fall 2015, utilizing our Mobile Water Treatment System to process dredge material contact water or elutriate, storm water and truck wash water. IAI's Mobile Water Treatment System includes chemical … [Read more...]

East Branch Grand Calumet River Remedial Action

March 3, 2015 by IAI

This remedial action project utilized hydraulic dredging to remove 145,377 cubic yards of contaminated sediment from the Grand Calumet River.  IAI was responsible for the sediment dewatering and water treatment portions of work. The sediment dewatering pad was installed over a brownfield site in East Chicago, where the contaminated sediment was … [Read more...]

Waukegan Harbor OU1 Remedial Action

March 18, 2014 by IAI

Waukegan Harbor OU1 Remedial Action, sediment consolidation facility

IAI served as sediment dewatering and water treatment subcontractor on the Waukegan Harbor OU1 project. The project removed 117,278 cubic yards of PCBs-contaminated sediment from Waukegan Harbor, in Waukegan, Illinois.  Sediment was hydraulically dredged from the harbor and transferred to the landside facility for processing and disposal. The sediment … [Read more...]

West Branch Grand Calumet River Remedial Action

March 15, 2014 by IAI

West Branch Grand Calumet River Remedial Action, sediment dewatering pad

The West Branch Grand Calumet River and Roxana Marsh Reaches 1 & 2 Remedial Action Project involves hydraulic dredging to remove contaminated sediment, geotextile tube dewatering of the dredged material, bulking and removal of the dewatered sediment from the site, and treatment of the geotextile tube weep water.  IAI is responsible for the sediment … [Read more...]

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions