IAI is working with our long-time client, Sun Communities, to install a new wastewater treatment plant at the Hidden Ridge RV Resort, in Hopkins, Michigan. IAI's Engineering, Mechanical Services, and Contract Operations are working together to permit, install, and soon, operate a 30,000-gpd membrane bio reactor (MBR). The new plant will treat sanitary … [Read more...]
Menominee Drinking Water & Wastewater Utilities
Operations, Maintenance & Management Services IAI has provided full contract operation of the City of Menominee's drinking water and wastewater treatment systems since 2001. A crew of nine full-time IAI employees provide operations, maintenance, and management services, of the City's facilities. 4.0 MGD Surface Water Filtration … [Read more...]
Sierra Brown Named MWEA’s Operations Professional of the Year
IAI is pleased to announce that IAI Regional Manager, Sierra Brown, has been selected by MWEA as the 2018 Operations Professional of the Year. Sierra received his award at the 92nd MWEA Annual Conference at Boyne Mountain Resort, Michigan, in June. Sierra has been a member of the IAI team since 2012, when he was hired as an Operations Specialist for … [Read more...]
Presque Isle Power Plant Pond Dredging
IAI was selected by We Energies to remove and dispose of accumulated sediment and coal combustion residuals (CCR) from a pond at the Presque Isle Power Plant in picturesque Marquette, Michigan. IAI provided general contractor services, and self-performed the geotextile tube dewatering portion of the work. Approximately 4,000 cubic yards of coal … [Read more...]
Port Austin Area Sewer and Water Authority
IAI began serving the Port Austin community in 2016, earning a contract to provide the Port Austin Area Sewer and Water Authority (PAASWA) with full contract operations and maintenance services for the wastewater and drinking water systems. IAI also administers the PAASWA utility billing process using BS&A software, prepares monthly and annual reports … [Read more...]
Conner Creek CSO Dredging Project
IAI dredged 180,000 cubic yards of in-situ material from Conner Creek to create capacity for a new combined sewage overflow treatment facility. The project involved the removal of approximately 100,000 cubic yards of contaminated sediments utilizing an 8 inch diameter swinging ladder dredge and an 8 inch diameter auger dredge. A specially designed header … [Read more...]