• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Projects / Dredging Water Treatment / East Branch Grand Calumet River Remedial Action

East Branch Grand Calumet River Remedial Action

March 3, 2015 by IAI

This remedial action project utilized hydraulic dredging to remove 145,377 cubic yards of contaminated sediment from the Grand Calumet River.  IAI was responsible for the sediment dewatering and water treatment portions of work.

The sediment dewatering pad was installed over a brownfield site in East Chicago, where the contaminated sediment was treated with polymer and dewatered in large circumference geotextile tubes.  Geotextile tubes were filled and stacked in three layers over the dewatering pad.  The geotextile tubes will be hauled away from the site in Summer 2014 and disposed of in a landfill.

Weep water from the tubes as well as storm water that fell on the dewatering pad was collected in a sump.  Sump water was pumped through an on-site wastewater treatment plant, which incorporated bag filters for suspended solids removal, and GAC vessels for the removal of dissolved organic contaminants.  The on-site wastewater treatment plant effluent was discharged back into the Grand Calumet River under an NPDES permit issued by the Indiana Dept. of Environmental Monitoring.  IAI’s on-staff Indiana Class D wastewater operator served as Operator of Record for the system and supervised all WTP operations, as well as certifying monthly discharge reports to the state.

Scope of Work

  • Provide 40-hour HAZWOPER certified staff
  • Design sediment dewatering area
  • Construct geotextile tube header system
  • Design, install and operate chemical feed system
  • Dewater hydraulically dredged sediment in geotextile tubes
  • Design, install and operate on-site wastewater treatment plant to treat geotextile tube weep water and storm water
  • Provide our on-staff Indiana Class D certified operator to supervise WTP operations, sampling, analysis and reporting to the Indiana Dept. of Environmental Management
  • Decommission header system and water treatment plant

Equipment Utilized

  • Automated chemical feed system for dredge slurry flocculation
  • 10 inch diameter HDPE geotextile tube header system
  • 16,400 lineal feet of large circumference geotextile tubes
  • 12 inch by 8 inch diameter Power Prime HH225C electric pump
  • 3,500 feet of 12 & 10 inch diameter HDPE pipeline for effluent discharge to the Grand Calumet River
  • 4,500 gpm (max. design flow) on-site wastewater treatment plant, including bag filters and Granular Activated Carbon vessels

Related Services

  • Environmental Dredging
  • Geotextile Tube Dewatering
  • Geotextile Tube Dewatering Test (GDT)
  • Mechanical Dewatering
  • Dredging Water Treatment
  • Mobile Water Treatment System
  • Dewatering System Design

More Project Experience

Cedar Creek OU2A Remedial Action

Portage Canal Segment 1 Dredging

Mill River Remediation

See more remediation projects...

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions