• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Projects / Dredging / Conner Creek CSO Dredging Project

Conner Creek CSO Dredging Project

March 20, 2014 by IAI

Conner Creek CSO Dredging Project, swinging ladder dredge
ClientWalsh Construction
LocationDetroit, Michigan
Sediment Contaminant of ConcernPolychlorinated biphenyls (PCBs)
Services ProvidedHydraulic dredging, mechanical dredging and geotextile tube dewatering

IAI dredged 180,000 cubic yards of in-situ material from Conner Creek to create capacity for a new combined sewage overflow treatment facility. The project involved the removal of approximately 100,000 cubic yards of contaminated sediments utilizing an 8 inch diameter swinging ladder dredge and an 8 inch diameter auger dredge. A specially designed header system, constructed of 10 inch diameter and 8 inch diameter HDPE pipe, delivered the dredge slurry to large diameter geotextile tubes, deployed over three separate lay down areas, for dewatering. Dewatered material in the geotextile tubes approached 50% solids at the time of disposal.

Water released from the geotextile tubes was clarified in a lined settling pond constructed near the geotextile tube laydown area. Water was discharged from this pond back into Conner Creek under the direction of an IAI licensed wastewater treatment operator and was regulated by an NPDES permit.

The balance of the project involved mechanically dredging approximately 80,000 cubic yards of native clay and some contaminated sediments. This material was thickened with a bulking agent prior to transport to landfill for disposal.

Scope of Work

  • Provide 40-hour HAZWOPER certified staff, including a licensed wastewater treatment operator
  • Hydraulically dredge 100,000 cubic yards of PCB-contaminated soft sediments
  • Complete daily hydrographic surveys
  • Remove large debris and trash from the dredge path
  • Design, construct and maintain dredged sediment transfer pipelines and sediment dewatering areas
  • Dewater hydraulically dredged material in geotextile tubes
  • Meet NPDES permit limitations for water released from the geotextile tubes under the direction of a licensed wastewater treatment operator, conduct daily on-site laboratory analysis and complete monthly Discharge Monitoring Reports
  • Mechanically dredge 80,000 cubic yards of native clay mixed with small quantities of accumulated soft sediments
  • Thicken mechanically dredged material

Equipment Utilized

  • 8 inch diameter swinging ladder dredge & 8 inch diameter auger dredge
  • Automated chemical feed system for dredge slurry flocculation
  • 10 inch and 8 inch diameter geotextile tube header systems
  • 40,000 lineal feet of geotextile tubes
  • Telehandler, front-end loader, survey & dredge support work boats
  • Hydrographic surveying equipment

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions