• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Projects / Dredging Water Treatment / Borrow Pit Remediation

Borrow Pit Remediation

September 25, 2014 by IAI

BorrowPit_wm

Summary

During this project, 14,000 cubic yards of contaminated sediment was hydraulically dredged from a former borrow pit and dewatered in geotextile tubes.  An existing asphalt parking lot was converted into a geotextile tube laydown area with the installation of temporary sand berms and a high density polyethylene (HDPE) liner.  Eighty foot circumference geotextile tubes, stacked in two layers over the temporary dewatering area, were used to dewater the dredged material.

Filtrate from the geotextile tubes was collected in a sump and pumped to a conventional sand filter at a rate of 1,000 gallons per minute.  The turbidity of the sand filter effluent was continuously monitored with an inline turbidity probe; if the effluent turbidity exceeded a set point, the water was recycled to the head of the sand filter for additional treatment.  The turbidity monitoring system was also equipped with an electronic data logger, so that every turbidity measurement taken could be recorded and later downloaded onto a laptop.  The discharge from the water treatment system was regulated by an NPDES permit issued by the Florida Department of Environmental Protection.

IAI project personnel were OSHA 40 hour Hazardous Waste Operations and Emergency Response (HAZWOPER) certified.

Scope of Work

  • Design and installation of the dewatering pad over an existing parking lot
  • Operation of the polymer makedown and injection systems
  • Installation, operation and maintenance of the geotextile tube header and dewatering system
  • Dredging water treatment, including NPDES permit monitoring

Equipment Utilized

  • 10 inch diameter HDPE geotextile tube header system
  • Flow- and density-paced automated chemical feed systems for dredge slurry conditioning
  • 1,770 lineal feet of 75 foot circumference geotextile tubes
  • Telehandler and 6-wheel ATV
  • Water treatment system consisting of pressurized sand filters

Related Services

  • Environmental Dredging
  • Geotextile Tube Dewatering
  • Geotextile Tube Dewatering Test (GDT)
  • Mechanical Dewatering
  • Dredging Water Treatment
  • Mobile Water Treatment System
  • Dewatering System Design

More Project Experience

Cedar Creek OU2A Remedial Action

Portage Canal Segment 1 Dredging

Mill River Remediation

See more remediation projects...

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions