• Join our team
    • Jobs
  • Meet us there
  • Send us a message
  • Learn about IAI

IAI

Clean Water Solutions

  • facebook
  • linkedin
  • youtube-play
  • email-alt
  • Services
    • Contract Operations, Maintenance & Management
      • Wastewater Treatment
      • Drinking Water Treatment
      • Certified Operators
      • Small Systems
      • Water & Wastewater Process Engineering
      • Mechanical Services for Water & Wastewater Utilities
    • Dredging
      • Environmental Dredging
      • Lagoon Sludge Removal
    • Sediment Dewatering
      • Geotextile Tube Dewatering
      • Geotextile Tube Dewatering Test (GDT)
      • Sediment Remediation
      • Mechanical Dewatering
      • Dewatering & Water Treatment Systems Design
    • Dredging Water Treatment
      • Mobile Water Treatment System
    • Wetlands & Shorelines
      • Shoreline Protection
  • Projects
    • Contract Operations
    • Dredging
    • Sediment Remediation
    • Geotextile Tube Dewatering
    • Mechanical Dewatering
    • Dredging Water Treatment
    • Wetlands & Shorelines
    • Coal Ash
  • News
  • Jobs
  • Conferences
  • About Us
  • Contact Us
You are here: Home / Projects / Coal Ash / Coal Ash (Fly Ash) Pond Dredging

Coal Ash (Fly Ash) Pond Dredging

March 19, 2014 by IAI

Geotextile tube filled with coal ash

IAI utilized an 8 inch diameter auger dredge to remove 25,000 cubic yards of coal ash (or fly ash) sludge from an industrial settling pond at a coal-fired electricity generation plant in Lumberton, North Carolina. The coal ash was dredged directly into geotextile tubes, which were deployed around the perimeter of the same pond. The filled geotextile tubes, which were stacked in two layers, created a new berm, increasing the useable depth of the pond. The resulting increase in capacity represented two years worth of sludge or 110,000 cubic yards. IAI’ design accommodates future expansion of the ponds because the geotextile tube berms can be stacked upon with additional layers of tubes, providing not only future disposal options for the coal ash but also an option to further increase the capacity of the pond.

IAI also designed and constructed a special weir structure to allow clear water to flow out of the pond. Total Suspended Solids (TSS) in the pond effluent is reduced because of improved hydraulics in the pond and the facility has been able to meet its NPDES permit discharge limits with greater ease.

In addition, the geotextile tube fabric prevents coal ash dust from migrating off-site and eliminates the need for seeding the berms.

Aerial view of coal ash pond
Aerial view of coal ash pond
Geotextile tube pilot test
Geotextile tube pilot test
Close up of water shedding off geotextile tube in pilot test
Close up of water shedding off geotextile tube in pilot test
Geotextile tube installed around the corner of the ash pond
Geotextile tube installed around the corner of the ash pond
Completed, stacked geotextile tube installation with weir structure
Completed, stacked geotextile tube installation with weir structure
Completed geotextile tubes installed around perimeter of coal ash pond
Completed geotextile tubes installed around perimeter of coal ash pond
Active coal ash pond with geotextile tubes installed around perimeter
Active coal ash pond with geotextile tubes installed around perimeter

Scope of Work

IAI was contracted to conduct an initial full scale pilot demonstration, as well as the resulting project. IAI was responsible for dredging 25,000 cubic yards of coal ash from the settling pond without disturbing the pond liner, dewatering the dredged ash in geotextile tubes, deploying the geotextile tubes around the perimeter of the pond to construct new berms, and designing and constructing a new weir structure to control effluent (clear water) discharge from the pond.

Equipment Utilized

  • 8 inch diameter hydraulic auger dredge
  • 8 inch diameter HDPE geotextile tube header system
  • 3,450 lineal feet of 45 foot and 90 foot circumference geotextile tubes

Coal Ash Geotextile Tube Wall Project Video

Related Services

  • Dredging
  • Geotextile Tube Dewatering
  • Geotextile Tube Dewatering Test (GDT)
  • Geotextile Tube Installations
  • Dewatering & Water Treatment Systems Design
  • Mobile Water Treatment System

More Coal Ash Posts

Geotextile Tube Wall – Coal Ash Project

Lower Pond CCR Dredging Project

Presque Isle Power Plant Pond Dredging

See more coal ash projects...

Contact Us

Recent Posts

2021 MWEA Virtual Biosolids Conference

March 29, 2021 |

Join IAI for the 2021 MWEA Biosolids Conference, a virtual training event providing up to 0.8 continuing education credits for Michigan wastewater operators. The conference will cover a wide range of issues facing wastewater utilities, related to biosolids handling and disposal.

IAI Names Martijn Luth, General Manager for Dredging & Sediment Dewatering Division

January 14, 2021 |

Please help us welcome Martijn Luth to the IAI team! Martijn will serve as General Manager for the Dredging & Sediment Dewatering Division.

IAI Welcomes Leslie Sorensen, P.E., to Engineering & Technical Services Division

November 4, 2020 |

Meet Leslie Sorensen, who has joined IAI as Senior Manager for the company’s Engineering & Technical Services (ETS) Division. Join us in welcoming Leslie, as well as celebrating the long career of Kent Trierweiler, as he prepares for retirement.

Latest Videos

Contact Us

info@iaiwater.com

616.866.1600

7888 Childsdale Ave. NE,
Rockford, Michigan 49341

Directions to our office

Services

  • Contract Operations, Maintenance & Management
  • Dredging
  • Sediment Dewatering
  • Dredging Water Treatment
  • Sediment Remediation
  • Coal Ash
  • Wetlands & Shorelines

Topics

geotextile tubes dredging water treatment contaminated sediment PCBs hydraulic dredging dredging HAZWOPER michigan water treatment coal ash environmental dredging Remedial Action NPDES

Like Us

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID

Copyright © 2026 Infrastructure Alternatives Inc. - All rights reserved. · Website by: Creative Solutions